google-site-verification: google902553ccad094fa1.html
top of page

HOW WE PRICE NEW HOME BUILDS ADELAIDE

PRICING YOUR NEW HOME BUILDS

BENCRETE are voted #1 on google reviews when it comes to concreting in Adelaide & we are PROUD & PASSIONATE about this!! 

We are able to provide concrete solutions for new builds. 

What separates us from others in the industry,  WE TURN UP & we want to be an integral part of your project.

When you deal with BENCRETE you are dealing with a PROFESSIONAL. We know we aren’t the cheapest but we tick all the right boxes "We treat every job as if it's our own."

 

Pricing Below is a guide only on previous jobs, Pricing is based on how much work is involved in your job (earthworks not included in below prices):

PRICING

Grey (Plain) Concrete start from $150m2

- Dead side footpaths start from $250m2 (Please see attached diagram below)

- Colour Concrete start from $180m2 (Additional $100m2 for dead side footpaths only)

- Exposed Aggregate start from $230m2 (Additional $100m2 for dead side footpaths only)

**When we concrete dead side footpaths this can be a time consuming process to achieve proper falls for water run off and is very labour intensive. With concreting we only ever get one chance to do a great job and for these sorts of jobs we need to ensure we have the right personal onsite to deliver the best outcome.

Above Pricing is for the Supply & Lay of:

-All Concrete at 100mm thickness. 

-Steel mesh & chairs to lift mesh.

-Formboards. 

-Plastic underlay (excluding driveway)

-Non slip finish with tool joints.

-Exposed finish for aggregate concrete with saw cuts.

-Tools & labour.

Capture.PNG

 

We ask all new customers to view our pricing before you organize a site visit with us.

Our Prices are based on Adelaide Metro. We also are happy to work country and need to factor in accommodation, travel and material surcharges.

COMMON QUESTIONS TO HELP QUOTE YOUR JOB

Do we have good access?

Do we need a concrete Pump?

Can we reverse a concrete truck up to the job location?

What is the size of your job?

Your Time Frame?

Your Suburb/location?

Has the ground been prepared?

Do we need to bring in fill, roadbase, rubble?

Do we need to bring in Earthmoving Equipment to level out the job (bobcat, excavator, dingo, jackhammer, demo saw) etc?

Extra helpers on the wheelbarrow?

Do we need to install drainage?

Is there adequate drainage?

bottom of page